How much does yard drainage work cost in Quebec?

For a typical project of 20 m (66 ft) of French drain and 2 downspouts (all of Quebec): $3,761 doing it yourself, $3,000 to $4,600 by a contractor, before tax.

Ava paver driveway in a hexagon pattern, image from Rinox's article on permeable paving
Photo: Rinox

Prices follow the chosen region when it has observed prices; otherwise the province-wide value applies and the confidence grade drops.

Do it yourself or hire a contractor

Both columns come from the same engine, with the same quantities. The difference: labour, site-scale equipment, overhead and margin.

Do it yourself

Materials at retail prices, rentals, delivery and disposal, plus your time as a beginner (*).

$3,761

* Includes your time: 49 h × $35.05/h (beginner). Money spent only: $2,043

Before tax
Money spent only$2,043
GST (5%)$102
QST (9.975%)$204
Total with taxes$2,349

Tools to buy, on top: $156

By a contractor

Labour, equipment, materials, overhead and margin.

estimate
$3,000 to $4,600
Displayed range, before tax
That is $46 to $71 per linear ft, before tax
Typical scenario$3,766
GST (5%)$188
QST (9.975%)$376
Total with taxes$4,330

Crew pace: 11 person-hours

Stacked extremes (everything low, everything high): $2,375 to $6,547

The range shows the effect of documented price and productivity spreads. It is not a probability.

Hiring costs less if your time is worth more than:

estimate
$35/h
Based on beginner hours.

At $35/h: the two options come out about even.

Break-even = (the contractor's typical price minus the money spent doing it yourself) divided by your person-hours. Before tax on both sides: GST and QST apply to both.

Your time

Your time
2
$35.05/h
By default, the average hourly wage in Quebec:
Money, hours, days, value of the time and true cost, beginner and intermediate
MeasureBeginnerIntermediate
Money spent$2,043$2,043
Person-hours49 h33 h
Days of 8 h, 2 people3.5 days2.5 days
Your time at $35/h$1,718$1,169
True cost$3,761$3,212

Working days only: add rain days and waiting times (curing, deliveries).

True cost: money and time

Before tax, one scale for every bar.

Money spentYour time ($35/h)Contractor's rangeTypical price ($3,800)
Do-it-yourself true cost and a contractor's price, before tax
Money, do it yourself$2,043
True cost, beginner$3,761
True cost, intermediate$3,212
Contractor$3,000 to $4,600 ($3,800)
Adjust the dimensions in the estimator

Where the money goes

A contractor's typical price, split by category. The same split applies to the do-it-yourself total, without overhead or margin.
Split of the typical price before tax
Materials16%$584
Labour13%$485
Equipment and rentals18%$679
Delivery and disposal17%$625
Overhead27%$1,017
Margin10%$377
What moves the total
  • Contractor overhead: $3,390 to $4,314
  • Price: Disposal: Mixed soil and rubble: $3,330 to $4,203
  • Contractor profit: $3,390 to $4,091

The range shows the effect of documented price and productivity spreads. It is not a probability.

Difficulty, time and tools

Level

Intermediate

Estimated working time
Beginner49 person-hours
Intermediate33 person-hours

Hours for the typical project: the work calculation (a crew's pace times the level's factor, with rework, learning and unloading) plus the guide's planning and checks.

To rent
  • Mini excavator 1.7 t
To buy
  • 1.2 m level
  • String line and line level
  • Wooden stakes
  • Marking paint
  • Work gloves
  • Hand tamper
When to call a pro
  • File a free Info-Excavation request at least 4 business days before you dig.Applies to the typical project
  • The outlet is less than 2 m from the line: confirm the line with your certificate of location or a land surveyor, and do not send water toward the neighbour.
  • A connection to the storm system or the building drain is plumbing work: hire a plumber who is a CMMTQ member.
  • A connection to the municipal system generally needs a permit and must follow the municipality's stormwater rules.
  • A downspout tied into the foundation drain overloads it: have it disconnected and discharged at the surface, away from the house.
  • A dry well less than 3 m from the foundation may send water back toward the basement: have the location checked.
See in the guide

The five phases

Every project follows the same sequence. The guide details each step, with its times and quantities.
  1. 01

    Understand where the water goes

    Before digging a drain, watch where water runs during a heavy rain and where it sits. Often it is enough to extend the downspouts away from the foundation and give the ground a slope that takes water away from the house.

  2. 02

    Rules, permits and locates

    A yard drain, a French drain or a swale on your land is not plumbing under the Construction Code: the plumbing chapter excludes piping not attached to a building and foundation drains. A connection to the building drain or the municipal sewer needs a plumber and, generally, a permit. Municipalities also have their own rules on downspouts and rainwater. Before you dig, file your Info-Excavation request.

  3. 03

    Dig the trench on a fall

    A French drain is a trench somewhat wider than the pipe, deep enough to hold a stone bed, the pipe and a stone cover. Its bottom must fall continuously toward the outlet: at least 1%, never less than 0.5%. A dip or a back-fall holds water and eventually clogs the drain. The calculator gives the width, the volume to dig and the spoil.

  4. 04

    Place the fabric, the stone and the drain

    Geotextile lines the trench so fine soil cannot clog the stone. The perforated drain sits on a bed of clear stone, gets covered with stone, then the fabric is closed over the top. Check the fall of the pipe itself, not only the bottom's. The calculator gives the tonnes of stone, the square metres of fabric and the pipe length.

  5. 05

    Backfill, connect the downspouts and finish the surface

    Above the fabric, backfill with site soil and reshape the surface so water heads to the swale or the outlet rather than the house. Downspouts are extended away from the foundation and discharge onto a surface that absorbs, never into the foundation drain. A catch basin goes at the low spot, its grate slightly below the surrounding ground, and connects through a sloped solid pipe. A dry well needs soil that absorbs: do an infiltration test before building it.

Rules in Quebec

What the law and municipalities require for this kind of work. Each line cites its source.
  • NeighboursAll of Quebec

    Lower land receives the natural flow of water from higher land, but the upper owner may not make the neighbour's situation worse (Civil Code of Quebec, art. 979). Do not aim your downspouts, drains or slopes at the neighbouring lot.

    Gouvernement du QuébecLégisQuébec, Éditeur officiel du QuébecChecked October 10, 2026

  • LicenceAll of Quebec

    Yard drains, French drains and swales not connected to a building, as well as foundation drains, are excluded from the Construction Code's plumbing chapter. A connection to the building drain or the municipal sewer belongs to a plumber who is a CMMTQ member (interpretation, to confirm with your municipality).

    LégisQuébec, Éditeur officiel du QuébecRégie du bâtiment du QuébecChecked October 10, 2026

  • Permitquebec

    Quebec City: increases in impervious area refer to the stormwater management sheets; near water and steep slopes, special rules apply; slopes are limited to 50% and 3 m high.

    Ville de QuébecChecked October 10, 2026

  • Permitsaint-remi

    Saint-Rémi: the explanatory document on rainwater management asks for a 10% slope over the first 1.8 m around the house, and about 2% toward the street. An example of a local drainage rule.

    Ville de Saint-RémiChecked October 10, 2026

  • SafetyAll of Quebec

    Never go into a trench deeper than 1.2 m unless its walls are shored or sloped back. Keep soil and materials at least 1.2 m from the edge and machines at least 3 m back. These rules bind employers; the danger is the same for a homeowner.

    Gouvernement du Québec (LégisQuébec)Checked October 10, 2026

  • LocateAll of Quebec

    Before digging, file a free Info-Excavation request at least 4 business days ahead; it is valid 180 days at most.

    Régie du bâtiment du QuébecChecked October 10, 2026

Before you hire

Six questions to ask every contractor. A good quote answers them in writing, with numbers.
  1. 01

    Who files the Info-Excavation request, and when?

    Locating underground networks is free and requested before digging. The requester's name and the ticket number should be on file.

  2. 02

    Where does the water go once the work is done?

    The slope, the outlet and what happens at the property line. You may not make runoff onto the neighbour worse.

  3. 03

    How much soil leaves the site, and where does it go?

    The quantity in cubic metres or tonnes, and whether hauling and disposal are in the price.

  4. 04

    Which materials and which thicknesses?

    Clear stone, topsoil, fill: the material's name and the thickness in millimetres.

  5. 05

    What gets restored?

    Lawn, driveway, beds damaged by machinery: included or not.

  6. 06

    What warranty, in writing?

    For sod take, the drain working, or fill settling.

In every case: an RBQ licence when the work requires one, a business number (NEQ), civil liability insurance and a written contract.

Guide: choosing a contractor

Sources and review

Draft: this content has not yet been reviewed by an installer or an engineer. The numbers come from the engine; the explanations may still change.

  • Last reviewed: October 10, 2026
  • Next review due: April 10, 2027
  • 21 sources cited