Skip to content
paysagement

How much does a paver walkway cost in Quebec?

For a typical project of 12 m² (129 sq ft), clay soil (all of Quebec): $8,825 doing it yourself, $7,400 to $12,000 by a contractor, before tax.

Curved Aspen paver walkway in ash charcoal lined with planting beds
Photo: Rinox

Prices follow the chosen region when it has observed prices; otherwise the province-wide value applies and the confidence grade drops.

Do it yourself or hire a contractor

Both columns come from the same engine, with the same quantities. The difference: labour, site-scale equipment, overhead and margin.

Do it yourself

Materials at retail prices, rentals, delivery and disposal, plus your time as a beginner (*).

$8,825

* Includes your time: 103.2 h × $35.05/h (beginner). Money spent only: $5,209

Before tax
Money spent only$5,209
GST (5%)$260
QST (9.975%)$520
Total with taxes$5,989

Tools to buy, on top: $305

By a contractor

Labour, equipment, materials, overhead and margin.

estimate
$7,400 to $12,000
Displayed range, before tax
That is $57 to $96 per sq ft, before tax
Typical scenario$9,532
GST (5%)$477
QST (9.975%)$951
Total with taxes$10,960

Crew pace: 32 person-hours

Stacked extremes (everything low, everything high): $4,443 to $19,515

The range shows the effect of documented price and productivity spreads. It is not a probability.

Hiring costs less if your time is worth more than:

estimate
$42/h
Based on beginner hours.

At $35/h: doing it yourself still costs less.

Break-even = (the contractor's typical price minus the money spent doing it yourself) divided by your person-hours. Before tax on both sides: GST and QST apply to both.

Your time

Your time
2
$35.05/h
By default, the average hourly wage in Quebec:
Money, hours, days, value of the time and true cost, beginner and intermediate
MeasureBeginnerIntermediate
Money spent$5,209$5,209
Person-hours103 h71 h
Days of 8 h, 2 people6.5 days4.5 days
Your time at $35/h$3,616$2,488
True cost$8,825$7,697

Working days only: add rain days and waiting times (curing, deliveries).

True cost: money and time

Before tax, one scale for every bar.

Money spentYour time ($35/h)Contractor's rangeTypical price ($9,500)
Do-it-yourself true cost and a contractor's price, before tax
Money, do it yourself$5,209
True cost, beginner$8,825
True cost, intermediate$7,697
Contractor$7,400 to $12,000 ($9,500)
Adjust the dimensions in the estimator

Where the money goes

A contractor's typical price, split by category. The same split applies to the do-it-yourself total, without overhead or margin.
Split of the typical price before tax
Materials24%$2,254
Labour13%$1,265
Equipment and rentals11%$1,049
Delivery and disposal15%$1,438
Overhead27%$2,574
Margin10%$953
What moves the total
  • Labour productivity (pavers): $8,369 to $11,459
  • Contractor overhead: $8,579 to $10,919
  • Contractor profit: $8,579 to $10,354

The range shows the effect of documented price and productivity spreads. It is not a probability.

What is under a well-built patio

  1. 01Pavers or slabs

    60 mm (2.4 in)

    The only layer you see, and the quickest to lay when everything below it is right.

    If corners are cutMisaligned pavers and uneven joints. The cause is usually in the layers below.

    Why
  2. 02Polymeric sand

    joints

    Fills the joints, locks the pavers together, slows weeds and erosion.

    If corners are cutPlain sand: joints wash out, pavers move, weeds move in.

    Why
  3. 03Concrete sand bedding

    25 mm (1 in)

    A thin layer, screeded level, that gives the flat surface. It does not fix an uneven base.

    If corners are cutStone dust or too thick a bed: water stays trapped, the bed shifts and dips appear.

    Why
  4. 04MG-20 crushed stone base

    250 mm (9.8 in), in 3 lifts

    The heart of the job. It carries the loads, drains water and limits frost effects. It is spread and compacted in thin lifts.

    If corners are cutA base too thin or compacted in one go: settling and frost heave.

    Why
  5. 05Geotextile

    membrane

    On clay or silt, a fabric separates the stone from the fine soil so the two do not mix.

    If corners are cutWithout geotextile on fine soil, the base sinks into the soil within a few years and loses its bearing capacity.

    Why
  6. 06Native soil, excavated and compacted

    335 mm (13.2 in) in total

    The soil is dug to the computed depth, sloped and compacted. The base does not go below the frost line: it drains.

    If corners are cutDigging too shallow to save on the bin: the base is thin and the patio follows the soil's movements.

    Why

Thicknesses computed for: 12 m² (129 sq ft), clay soil

Cross-section of a paver patio: pavers, polymeric sand joints, bedding, compacted crushed stone base, geotextile and native soil.

Difficulty, time and tools

Level

Beginner possible

Estimated working time
Beginner103 person-hours
Intermediate71 person-hours

Hours for the typical project: the work calculation (a crew's pace times the level's factor, with rework, learning and unloading) plus the guide's planning and checks.

To rent
  • Mini excavator 1.7 t
  • Plate compactor
  • 14 in cut-off saw
To buy
  • Marking paint
  • Heavy tarp
  • Stakes and mason's string
  • 3 m aluminium straightedge
  • Hand tamper
  • 3 lb sledgehammer
  • Work gloves
  • Two 1 in pipes (screed rails)
  • Rubber mallet
  • Knee pads
  • Diamond blade for concrete
  • Safety glasses, hearing protection and a well-fitted dust mask
When to call a pro
  • Any digging needs an Info-Excavation locate request at least 4 business days before starting, and hand digging within 1 m of the marks.Applies to the typical project
  • In a front yard, several municipalities cap the paved share, require light or permeable materials, or a permit. Check with your municipality or borough before ordering.Applies to the typical project
  • Below a 1.5% slope, water is likely to pond on the pavers. Have a professional check the drainage, or increase the slope.
  • A surface higher than the existing ground needs fill compacted in lifts and often a low wall or retaining wall. A wall that holds back soil can fall under the Engineers Act depending on its function, the soil and the loads: see the walls guide and a professional.
  • Paving over a roof, deck or garage adds load to the structure and affects the waterproofing: hire a structural engineer.
  • Paving over an existing slab needs a sound slab and drainage holes drilled through it. Have a professional assess the slab before choosing this method.
See in the guide

The five phases

Every project follows the same sequence. The guide details each step, with its times and quantities.
  1. 01

    Assess your walkway

    A walkway mostly carries foot traffic, but it goes through the same frost as a patio, with two free sides along its whole length. It is a good DIY project if the base matches the native soil and both edges are restrained. Plan from the start where it meets the steps, the driveway and the sidewalk.

  2. 02

    Locates, rules and orders

    A front walkway often crosses the service lines that run from the street to the house. Locating is free and comes before any digging. In a front yard, the paved share and the materials are often regulated.

  3. 03

    Layout and excavation

    The excavation depth adds up the paver, the bedding and the base, whose thickness depends on the soil, even for a pedestrian surface. Both free sides get extra base width. "Your project" shows the depth and the volume to haul away.

  4. 04

    Base

    Even under foot traffic, a base that is too thin on clay or silt lets the walkway heave into steps in the first winter. Build the thickness calculated for your soil, in compacted lifts, and restrain both edges.

  5. 05

    Laying and finishing

    On a walkway, cuts and joins take a larger share of the time than on a patio. Work from one end to the other keeping joint lines straight to the string, then compact and joint in dry weather.

Rules in Quebec

What the law and municipalities require for this kind of work. Each line cites its source.
  • LocateAll of Quebec

    Before digging, file a free request with Info-Excavation. The RBQ asks contractors to file it at least 4 business days before the work; it is valid until the stated end date, for at most 180 days. The construction safety code requires the employer to locate lines before digging. For an owner doing their own work, the request is strongly recommended even though that duty targets employers, and some municipalities, such as Magog, require it on their land.

    Régie du bâtiment du QuébecGouvernement du Québec (LégisQuébec)Ville de MagogChecked October 10, 2026

  • LicenceAll of Quebec

    Per the RBQ licence guide, landscaping on private land, such as private driveways, low walls and paver landings resting on gravel that are not attached to the building, needs no licence. Owners may do this work at their own home, except electrical and gas work, which always goes to a qualified contractor. If you hire, check in the RBQ register that the contractor's subcategories cover the other parts of the contract, such as excavation or concrete.

    Régie du bâtiment du QuébecRégie du bâtiment du QuébecRégie du bâtiment du QuébecChecked October 10, 2026

  • PermitMontréal

    In Montreal, front-yard rules vary by borough: Saint-Laurent caps paving at 40% of the front yard with a 1 m green strip along the lot line, several boroughs require a solar reflectance index of at least 29, and Verdun accepts permeable paving with joints of at least 8 mm. A walkway that also serves as a parking access needs a permit.

    Ville de MontréalChecked October 10, 2026

  • NeighboursAll of Quebec

    The Civil Code (art. 979) requires lower land to receive the natural flow from higher land, but forbids the owner of the higher land from making the neighbour's situation worse. A new paved surface that concentrates water toward the lot line can therefore make you liable.

    Gouvernement du QuébecChecked October 10, 2026

Before you hire

Six questions to ask every contractor. A good quote answers them in writing, with numbers.
  1. 01

    How thick is the base, and what material?

    The answer should be a number in millimetres and a named material, for example MG-20, matched to the soil and the use.

  2. 02

    In how many lifts is the base compacted?

    A base is compacted in thin lifts with a plate compactor. One pass over the full thickness is not enough.

  3. 03

    Is a geotextile included?

    On clay or silt, it separates the stone from the fine soil. Without it, the base mixes into the soil over the years.

  4. 04

    Which bedding and which joint sand?

    Concrete sand for the bedding, polymeric sand for the joints. Stone dust holds water under the pavers.

  5. 05

    Which edge restraint, and on which sides?

    Every free side needs an edge restraint fixed into the base, or the pavers spread apart.

  6. 06

    What labour warranty, in writing?

    The number of years and what is covered: settling, heaving, joints.

In every case: an RBQ licence when the work requires one, a business number (NEQ), civil liability insurance and a written contract.

Guide: choosing a contractor

Sources and review

Draft: this content has not yet been reviewed by an installer or an engineer. The numbers come from the engine; the explanations may still change.

  • Last reviewed: October 10, 2026
  • Next review due: April 10, 2027
  • 36 sources cited
All the guide's sources

Words used on this page