How much does a paver driveway cost in Quebec?

For a typical project of 55.7 m² (600 sq ft), clay soil (all of Quebec): $30,323 doing it yourself, $27,000 to $44,000 by a contractor, before tax.

Proma paver driveway in Oka beige with caviar bands in front of a modern house
Photo: Rinox

Prices follow the chosen region when it has observed prices; otherwise the province-wide value applies and the confidence grade drops.

Do it yourself or hire a contractor

Both columns come from the same engine, with the same quantities. The difference: labour, site-scale equipment, overhead and margin.

Do it yourself

Materials at retail prices, rentals, delivery and disposal, plus your time as a beginner (*).

$30,323

* Includes your time: 318.4 h × $35.05/h (beginner). Money spent only: $19,164

Before tax
Money spent only$19,164
GST (5%)$958
QST (9.975%)$1,912
Total with taxes$22,034

Tools to buy, on top: $305

By a contractor

Labour, equipment, materials, overhead and margin.

estimate
$27,000 to $44,000
Displayed range, before tax
That is $45 to $73 per sq ft, before tax
Typical scenario$34,741
GST (5%)$1,737
QST (9.975%)$3,465
Total with taxes$39,944

Crew pace: 104 person-hours

Stacked extremes (everything low, everything high): $17,848 to $69,697

The range shows the effect of documented price and productivity spreads. It is not a probability.

Hiring costs less if your time is worth more than:

estimate
$49/h
Based on beginner hours.

At $35/h: doing it yourself still costs less.

Break-even = (the contractor's typical price minus the money spent doing it yourself) divided by your person-hours. Before tax on both sides: GST and QST apply to both.

Your time

Your time
2
$35.05/h
By default, the average hourly wage in Quebec:
Money, hours, days, value of the time and true cost, beginner and intermediate
MeasureBeginnerIntermediate
Money spent$19,164$19,164
Person-hours318 h219 h
Days of 8 h, 2 people20 days14 days
Your time at $35/h$11,159$7,683
True cost$30,323$26,847

Working days only: add rain days and waiting times (curing, deliveries).

True cost: money and time

Before tax, one scale for every bar.

Money spentYour time ($35/h)Contractor's rangeTypical price ($35,000)
Do-it-yourself true cost and a contractor's price, before tax
Money, do it yourself$19,164
True cost, beginner$30,323
True cost, intermediate$26,847
Contractor$27,000 to $44,000 ($35,000)
Adjust the dimensions in the estimator

Where the money goes

A contractor's typical price, split by category. The same split applies to the do-it-yourself total, without overhead or margin.
Split of the typical price before tax
Materials25%$8,660
Labour11%$3,843
Equipment and rentals8%$2,896
Delivery and disposal13%$4,563
Overhead27%$9,380
Margin10%$3,474
Other6%$1,925
What moves the total
  • Contractor overhead: $31,267 to $39,795
  • Labour productivity (pavers): $31,781 to $39,408
  • Contractor profit: $31,267 to $37,736

The range shows the effect of documented price and productivity spreads. It is not a probability.

What is under a well-built patio

  1. 01Pavers or slabs

    90 mm (3.5 in)

    The only layer you see, and the quickest to lay when everything below it is right.

    If corners are cutMisaligned pavers and uneven joints. The cause is usually in the layers below.

    Why
  2. 02Polymeric sand

    joints

    Fills the joints, locks the pavers together, slows weeds and erosion.

    If corners are cutPlain sand: joints wash out, pavers move, weeds move in.

    Why
  3. 03Concrete sand bedding

    25 mm (1 in)

    A thin layer, screeded level, that gives the flat surface. It does not fix an uneven base.

    If corners are cutStone dust or too thick a bed: water stays trapped, the bed shifts and dips appear.

    Why
  4. 04MG-20 crushed stone base

    400 mm (15.7 in), in 3 lifts

    The heart of the job. It carries the loads, drains water and limits frost effects. It is spread and compacted in thin lifts.

    If corners are cutA base too thin or compacted in one go: settling and frost heave.

    Why
  5. 05Geotextile

    membrane

    On clay or silt, a fabric separates the stone from the fine soil so the two do not mix.

    If corners are cutWithout geotextile on fine soil, the base sinks into the soil within a few years and loses its bearing capacity.

    Why
  6. 06Native soil, excavated and compacted

    515 mm (20.3 in) in total

    The soil is dug to the computed depth, sloped and compacted. The base does not go below the frost line: it drains.

    If corners are cutDigging too shallow to save on the bin: the base is thin and the patio follows the soil's movements.

    Why

Thicknesses computed for: 55.7 m² (600 sq ft), clay soil

Cross-section of a paver patio: pavers, polymeric sand joints, bedding, compacted crushed stone base, geotextile and native soil.

Difficulty, time and tools

Level

Pro recommended

Estimated working time
Beginner318 person-hours
Intermediate219 person-hours

Hours for the typical project: the work calculation (a crew's pace times the level's factor, with rework, learning and unloading) plus the guide's planning and checks.

To rent
  • Mini excavator 3.5 t
  • Skid steer
  • Medium reversible plate
  • 14 in cut-off saw
To buy
  • Marking paint
  • Heavy tarp
  • Stakes and mason's string
  • 3 m aluminium straightedge
  • 3 lb sledgehammer
  • Work gloves
  • Two 1 in pipes (screed rails)
  • Rubber mallet
  • Knee pads
  • Diamond blade for concrete
  • Safety glasses, hearing protection and a well-fitted dust mask
When to call a pro
  • Any digging needs an Info-Excavation locate request at least 4 business days before starting, and hand digging within 1 m of the marks.Applies to the typical project
  • A new or widened curb cut needs a municipal certificate. In Montreal, Laval and Longueuil, the city or its contractor does the curb and sidewalk work, on its own schedule.Applies to the typical project
  • Laval and Longueuil ask for a certificate of location or surveyor's certificate with the curb cut application. If you do not have a recent one, plan for a land surveyor.Applies to the typical project
  • A driveway on clay, silt or unknown soil needs the thickest base in the table and a geotextile. The maker advises a professional's opinion for soils very prone to frost: have the design checked.Applies to the typical project
  • A surface for heavy vehicles (RV, delivery trucks, commercial use) needs a design by an engineer or a geotechnical specialist; this guide does not cover it.
  • In a front yard, several municipalities cap the paved share, require light or permeable materials, or a permit. Check with your municipality or borough before ordering.Applies to the typical project
See in the guide

The five phases

Every project follows the same sequence. The guide details each step, with its times and quantities.
  1. 01

    Assess your driveway

    A paver driveway carries the weight of cars, turning tires, snow clearing and salt. Compared with a patio, the base is markedly thicker, the pavers thicker and the geotextile always there. Access to the street goes through the municipality. Professional help is recommended for this project, especially on clay or silt.

  2. 02

    Permits, curb cut and locates

    A driveway touches public land and parking rules. Plan two separate steps: the parking area permit for your lot, and the curb cut certificate for the curb and sidewalk, which the city often does itself on its own schedule. Locating underground networks comes before any digging.

  3. 03

    Layout and excavation

    Grades are taken from two fixed points: the garage slab and the sidewalk. Between them, the surface keeps a continuous slope toward the street. The excavation is deep and the soil volume large: "Your project" shows the depth, the volume and the number of truckloads.

  4. 04

    Base

    Under a driveway, the base is the most important part of the project. It is built in lifts compacted with a reversible plate, on a geotextile, and extends past the paving on free sides. A driveway laid on a patio base forms ruts within the first years.

  5. 05

    Laying and finishing

    Under the tires, a driveway needs an even bed, tight joints, no small pieces in the wheel paths, full compaction and well-filled joints. Keep cars off until the polymeric sand has cured.

Rules in Quebec

What the law and municipalities require for this kind of work. Each line cites its source.
  • LocateAll of Quebec

    Before digging, file a free request with Info-Excavation. The RBQ asks contractors to file it at least 4 business days before the work; it is valid until the stated end date, for at most 180 days. The construction safety code requires the employer to locate lines before digging. For an owner doing their own work, the request is strongly recommended even though that duty targets employers, and some municipalities, such as Magog, require it on their land.

    Régie du bâtiment du QuébecGouvernement du Québec (LégisQuébec)Ville de MagogChecked October 10, 2026

  • LicenceAll of Quebec

    Per the RBQ licence guide, landscaping on private land, such as private driveways, low walls and paver landings resting on gravel that are not attached to the building, needs no licence. Owners may do this work at their own home, except electrical and gas work, which always goes to a qualified contractor. If you hire, check in the RBQ register that the contractor's subcategories cover the other parts of the contract, such as excavation or concrete. The RBQ's subcategory 2.7 includes paver parking lots; the line between a residential driveway and a parking lot is not defined, and our reading is that a single-family driveway stays exempt (interpretation to confirm with the RBQ).

    Régie du bâtiment du QuébecRégie du bâtiment du QuébecRégie du bâtiment du QuébecChecked October 10, 2026

  • PermitMontréal

    A permit is required to build, modify or remove a parking space or access. For the curb cut, the City lowers the sidewalk itself from May to October; an access is 2.4 to 7.5 m wide, all accesses take no more than 50% of the lot width and two accesses are at least 7.5 m apart. Some boroughs bill the actual cost plus 15% and prohibit cutting a tree for the access.

    Ville de MontréalVille de MontréalChecked October 10, 2026

  • PermitLaval

    A certificate is required to widen or narrow a sidewalk or curb. Only the City does that work and bills it after issuance. The file includes a sketch of the widths, a site plan and a surveyor's certificate. (Search summary of the official site, to re-check.)

    Ville de LavalChecked October 10, 2026

  • PermitLongueuil

    A certificate is required for every curb cut, filed with the parking area application and a certificate of location. Width equal to the driveway at the street line, at most two accesses per lot, at least 6 m apart and 7.5 m from the intersection. The applicant pays, and a City contractor does the work in about 8 weeks, sometimes the following year.

    Ville de LongueuilChecked October 10, 2026

  • PermitGatineau

    The allowed driveway width depends on the lot frontage, measured at the street line: 2.5 to 5.5 m up to 11 m of frontage, 2.5 to 6 m from 11 to 20 m, 2.5 to 7.5 m beyond. (Search summary of the official site, to re-check.)

    Ville de GatineauChecked October 10, 2026

  • PermitSherbrooke

    A permit is required to widen a curb cut or build a new asphalt yard; curb and sidewalk cutting and repair fees may apply. (Search summary of the official site, to re-check.)

    Ville de SherbrookeChecked October 10, 2026

  • LicenceAll of Quebec

    Act R-20 on the construction industry excludes landscaping, including asphalt or concrete driveways, done on a detached single-family house by an employer that is not a professional construction employer. For a semi-detached, row house, duplex or condo, or with a contractor whose main activity is construction, CCQ rules can apply, which changes the labour rates in a quote.

    Commission de la construction du QuébecChecked October 10, 2026

  • NeighboursAll of Quebec

    The Civil Code (art. 979) requires lower land to receive the natural flow from higher land, but forbids the owner of the higher land from making the neighbour's situation worse. A new paved surface that concentrates water toward the lot line can therefore make you liable.

    Gouvernement du QuébecChecked October 10, 2026

  • Consumer protectionAll of Quebec

    If you hire, ask for a written contract. The RBQ recommends that it show the licence number where applicable, the NEQ, the GST and QST numbers, the exact legal name and an itemized price (labour, materials, transport, equipment rental, subcontractors), with the smallest possible deposit. The Office de la protection du consommateur also lists what to ask for.

    Régie du bâtiment du QuébecOffice de la protection du consommateurChecked October 10, 2026

Before you hire

Six questions to ask every contractor. A good quote answers them in writing, with numbers.
  1. 01

    How thick is the base, and what material?

    The answer should be a number in millimetres and a named material, for example MG-20, matched to the soil and the use.

  2. 02

    In how many lifts is the base compacted?

    A base is compacted in thin lifts with a plate compactor. One pass over the full thickness is not enough.

  3. 03

    Is a geotextile included?

    On clay or silt, it separates the stone from the fine soil. Without it, the base mixes into the soil over the years.

  4. 04

    Which bedding and which joint sand?

    Concrete sand for the bedding, polymeric sand for the joints. Stone dust holds water under the pavers.

  5. 05

    Which edge restraint, and on which sides?

    Every free side needs an edge restraint fixed into the base, or the pavers spread apart.

  6. 06

    What labour warranty, in writing?

    The number of years and what is covered: settling, heaving, joints.

In every case: an RBQ licence when the work requires one, a business number (NEQ), civil liability insurance and a written contract.

Guide: choosing a contractor

Sources and review

Draft: this content has not yet been reviewed by an installer or an engineer. The numbers come from the engine; the explanations may still change.

  • Last reviewed: October 10, 2026
  • Next review due: April 10, 2027
  • 47 sources cited