Landscape lighting estimator
Amounts before taxes. GST (5%) and QST (9.975%) are added and shown separately. Source: paysagement cost databaseObserved October 13, 2026Region: QuebecPrices as of October 13, 2026 · Quebec · engine 1.2.0estimateReliability grade C
Good to know before you start
Before you digEven a shallow slit is digging: file a free Info-Excavation request before opening the ground.
Source: Régie du bâtiment du Québec, Travaux d'excavation · APSAM (Association paritaire pour la santé et la sécurité du travail, secteur affaires municipales), Fiche technique 34, Protéger les services publics souterrains
Other notes from the calculation (4)
- Burial depth of 12 V cable not verified: follow the maker's instructions and the electrical code.
- Transformer, cable and fixtures certified for Canada (CSA, cUL or cETL mark).
- No machine within 1 m of the locate marks: expose utilities by hand.
- RBQ licence: subcategory none for this kind of excavation (licence required: false).
Where the money goes
Before taxes, one scale for both bars.
Do it yourself, money spent
$775- Materials$775
Contractor, typical price
$1,666- Materials$717
- Labour$333
- Overhead$450
- Margin$167
True cost: money and time
Before tax, one scale for every bar.
| Money, do it yourself | $775 |
|---|---|
| True cost, beginner | $1,952 |
| True cost, intermediate | $1,589 |
| Contractor | $1,400 to $2,100 ($1,700) |
Your time
| Measure | Beginner | Intermediate |
|---|---|---|
| Money spent | $775 | $775 |
| Person-hours | 34 h | 23 h |
| Days of 8 h, 2 people | 2.5 days | 1.5 days |
| Your time at $35/h | $1,177 | $814 |
| True cost | $1,952 | $1,589 |
Working days only: add rain days and waiting times (curing, deliveries).
Hiring costs less if your time is worth more than:
estimateAt $35/h: hiring costs less.
Break-even = (the contractor's typical price minus the money spent doing it yourself) divided by your person-hours. Before tax on both sides: GST and QST apply to both.
Actions
Estimates are computed in your browser: no account, and your projects stay on your device. The page link holds your choices: copy it to come back or to share it. "Save this project" keeps it in this browser only, nothing is sent. My projects
Step-by-step guide
Phases, "done when" checks, safety, common mistakes and sources, with your project's quantities.
What you buy, rent and pay for
Tools to buy (2)
Untick the ones you already own.- $13.99
- $28.49
- Total before taxes
- $774.63
- GST (5%)
- $38.73
- QST (9.975%)
- $77.27
- Total with taxes
- $890.63
GST and QST are computed on purchases and rentals; your own work is not taxed.
How many hours, at what pace
- Work
- 19.9 h
- Rework
- 2 h
- Learning the machines
- 0 h
- Planning and checks
- 11.7 h
Beginner: has never compacted a base or cut pavers.
- Work
- 14.5 h
- Rework
- 0.7 h
- Learning the machines
- 0 h
- Planning and checks
- 8.1 h
Intermediate: has done at least one similar project.
For comparison, a professional: 7.5 h of work, about 0.5 crew days.
Step by step, from the guide
Each guide step, timed by the same calculation as the total: each task's hours at your level's pace, rework included. Hover a value to see the range.
| Step | Beginner | Intermediate |
|---|---|---|
| 1Draw the lighting planguide rate | 2.9 | 2 |
| Add up the load and choose the transformerguide rate | 1.5 | 1 |
| Check voltage drop and choose the gaugeguide rate | 1.5 | 1 |
| 2Check the outdoor outlet and call an electrician if neededguide rate | 0.7 | 0.5 |
| Request a locate before opening the groundguide rate | 0.7 | 0.5 |
| 3Open the slits and run the cableweather | 4.4 | 3.1 |
| Run sleeves under hard surfacesguide rate | 1.5 | 1 |
| 4Mount the transformer and connect the runs | 2.9 | 2 |
| 5Fit the fixtures and make the connections | 14.6 | 10.1 |
| Measure the voltage at the last fixtureguide rate | 1.5 | 1 |
| Aim, schedule and close the slitsguide rate | 1.4 | 1 |
| Total (p-h) | 33.6 | 23.2 |
The rows add up to the total: 21.9 h of work calculated by the engine, plus 11.7 h of planning and checks at the guide's rate (beginner). One step depends on the weather. Read the full guide
Detail by calculation task(3)
| Task | Pro | Beginner | Intermediate |
|---|---|---|---|
| Fixture installation | 5 | 14.6 | 10.1 |
| Low-voltage cable laying | 1.5 | 4.4 | 3.1 |
| Transformer installation | 1 | 2.9 | 2 |
| Learning the machines | - | 0 | 0 |
| Total | 7.5 | 33.6 | 23.2 |
Person-hours per task. Beginner and intermediate hours include rework.
What a contractor would charge
Before taxes
Where the money goes (typical price before taxes, $1,666)
| Materials | 43% | $717 |
|---|---|---|
| Labour | 20% | $333 |
| Overhead(estimate) | 27% | $450 |
| Margin(estimate) | 10% | $167 |
| Typical price before taxes | $1,666 | |
| GST (5%) | $83.28 | |
| QST (9.975%) | $166.15 | |
| Typical price with taxes | $1,915 |
Permits, licences and neighbours
- RBQ licence
Electrical installation work, lighting with its wires and devices included, is reserved to CMEQ members when done for others. A homeowner may not do their own electrical work, even at home: a new outlet, a circuit or a hard-wired transformer needs an electrician.
Source: Gouvernement du Québec (LégisQuébec), Loi sur les maîtres électriciens, RLRQ c. M-3 · Régie du bâtiment du Québec, Travaux que vous pouvez faire vous-même
- RBQ licence
For a contractor installing only the 12 V side of a plug-in kit at a client's home, our sources do not settle the licence question. Ask the business whether it is a CMEQ member and check its licences before signing.
Source: Gouvernement du Québec (LégisQuébec), Loi sur les maîtres électriciens, RLRQ c. M-3 · Régie du bâtiment du Québec, Vérifier la licence d'un entrepreneur
- Safety
The Electricity chapter of the Construction Code adopts the Canadian Electrical Code with Quebec amendments. Choose equipment certified for Canada and plug the transformer into a GFCI-protected outdoor outlet.
Source: LégisQuébec, Éditeur officiel du Québec, Code de construction, RLRQ c. B-1.1, r. 2
- Utility locate
Before opening the ground for a cable or a spiked fixture, file a free Info-Excavation request.
Source: Régie du bâtiment du Québec, Travaux d'excavation · Hydro-Québec, What to do before you dig (underground lines)
- Consumer protection
Ask for a written contract detailing the fixtures, transformer, cable, the electrician's share, the total price and the warranty.
Source: Office de la protection du consommateur, Request a contract (before hiring a renovation contractor)
Calculation parameters
See the assumptions(22)
Region: Quebec · prices as of October 13, 2026 · engine 1.2.0. These three values are enough to reproduce this calculation.
Where the numbers come from
- 1.paysagement (research), Costs: equipment rentals, labour, production rates and contractor sell prices (Quebec, 2025 to 2026)October 10, 2026 · Amérique du Nord · 10 values
- 2.paysagement (engine plan), Engine parameter registry seed list (estimates with no external source)October 10, 2026 · Québec · 3 values
- 3.Job Bank (Guichet-Emplois), wage report, EI survey data 2023-2024, updated 2025-11-19November 19, 2025 · Québec · 2 values
- 4.Home Depot Canada product page (price read from the search engine's copy of the page; direct fetch refused)October 10, 2026 · Québec · 1 value
- 5.Home Depot Canada product page (price read from the search engine's copy of the page; direct fetch refused)October 10, 2026 · Québec · 1 value
- 6.Home Depot Canada product page (price read from the search engine's copy of the page; direct fetch refused)October 10, 2026 · Québec · 1 value
- 7.Home Depot Canada product page (price read from the search engine's copy of the page; direct fetch refused)October 10, 2026 · Québec · 1 value
- 8.Job Bank (Guichet-Emplois), wage report, EI survey data 2023-2024, updated 2025-11-19November 19, 2025 · Québec · 1 value
- 9.Job Bank (Guichet-Emplois), wage report, EI survey data 2023-2024, updated 2025-11-19November 19, 2025 · Québec · 1 value
- 10.Job Bank (Guichet-Emplois), wage report, EI survey data 2023-2024, updated 2025-11-19November 19, 2025 · Québec · 1 value
- 11.Patrick Morin, Minuterie exterieure cordon photoelectronique, 24 heures (Woods)October 10, 2026 · Québec · 1 value
- 12.Patrick Morin, Multimetre numerique, manuel (Gardner Bender)October 10, 2026 · Québec · 1 value
- 13.Patrick Morin, Pince a denuder multi-outil, sertissage/denudage (Gardner Bender)October 10, 2026 · Québec · 1 value
- 14.Patrick Morin, Tuyau d'egout en PVC 4 po x 13 pi (EGOUSDR35)October 10, 2026 · Québec · 1 value