Steps estimator
Amounts before taxes. GST (5%) and QST (9.975%) are added and shown separately. Source: paysagement cost databaseObserved October 13, 2026Region: QuebecPrices as of October 13, 2026 · Quebec · engine 1.2.0estimateReliability grade C
Good to know before you start
Before you digFile a free Info-Excavation request at least 4 business days before you dig.
4 risers: a handrail is required above 3 risers on an exterior stair serving a dwelling.
Call a proThese steps serve the house entrance: the code rules apply (uniform rises, run, width, handrail, guard). Have the plan checked if in doubt.
Source: Centre canadien d'hygiène et de sécurité au travail (CCHST), Escaliers : prévention contre les chutes · CAA-Québec, Garde-corps et main courante pour votre sécurité
MunicipalityWith about four risers or more at an entrance, a handrail is generally required. Check your municipality's rule.
Source: CAA-Québec, Garde-corps et main courante pour votre sécurité
Other notes from the calculation (4)
- No machine within 1 m of the locate marks: expose utilities by hand.
- RBQ licence: subcategory 2.7 for this kind of excavation (licence required: false).
- Entrance stair: code rules apply (equal risers of 0.125 to 0.18 m, run of 0.255 to 0.355 m). Quebec Construction Code edition to confirm.
- Steps against a landing: either on footings below frost or fully floating and separated from the landing. Never mix the two.
Where the money goes
Before taxes, one scale for both bars.
Do it yourself, money spent
$2,351- Materials$846
- Equipment rental$881
- Disposal$625
Contractor, typical price
$4,148- Materials$759
- Labour$351
- Equipment and rentals$878
- Delivery and disposal$625
- Overhead$1,120
- Margin$415
True cost: money and time
Before tax, one scale for every bar.
| Money, do it yourself | $2,351 |
|---|---|
| True cost, beginner | $3,835 |
| True cost, intermediate | $3,359 |
| Contractor | $3,400 to $5,000 ($4,100) |
Your time
| Measure | Beginner | Intermediate |
|---|---|---|
| Money spent | $2,351 | $2,351 |
| Person-hours | 42 h | 29 h |
| Days of 8 h, 2 people | 3 days | 2 days |
| Your time at $35/h | $1,484 | $1,007 |
| True cost | $3,835 | $3,359 |
Working days only: add rain days and waiting times (curing, deliveries).
Hiring costs less if your time is worth more than:
estimateAt $35/h: doing it yourself still costs less.
Break-even = (the contractor's typical price minus the money spent doing it yourself) divided by your person-hours. Before tax on both sides: GST and QST apply to both.
Actions
Estimates are computed in your browser: no account, and your projects stay on your device. The page link holds your choices: copy it to come back or to share it. "Save this project" keeps it in this browser only, nothing is sent. My projects
Step-by-step guide
Phases, "done when" checks, safety, common mistakes and sources, with your project's quantities.
What you buy, rent and pay for
Tools to buy (6)
Untick the ones you already own.- $8.99
- $129.99
- $16.99
- $9.99
- $16.99
- $13.99
- Total before taxes
- $2,351.30
- GST (5%)
- $117.57
- QST (9.975%)
- $234.54
- Total with taxes
- $2,703.41
GST and QST are computed on purchases and rentals; your own work is not taxed.
Notes on prices(4)
- Price for "Clear stone 3/4 in (14-20 mm)" out of date since 2025-04-01: confirm with the supplier.
- Price for "MG-20 crushed stone (0-3/4 in)" out of date since 2025-04-01: confirm with the supplier.
- Price for "Proma slab 60 mm" is an estimate (no published price list).
- Price for "Solino wall" is an estimate (no published price list).
How many hours, at what pace
- Work
- 21.2 h
- Rework
- 2.1 h
- Learning the machines
- 1.5 h
- Planning and checks
- 17.5 h
Beginner: has never compacted a base or cut pavers.
- Work
- 15.4 h
- Rework
- 0.8 h
- Learning the machines
- 0.5 h
- Planning and checks
- 12.1 h
Intermediate: has done at least one similar project.
For comparison, a professional: 8 h of work, about 0.5 crew days.
Step by step, from the guide
Each guide step, timed by the same calculation as the total: each task's hours at your level's pace, rework included. Hover a value to see the range.
| Step | Beginner | Intermediate |
|---|---|---|
| 1Measure the total rise and the space availableguide rate | 2.9 | 2.1 |
| Choose the system and match the blocks to the riseguide rate | 1.5 | 1 |
| 2Check which rules applyguide rate | 2.9 | 2 |
| File the locate requestguide rate | 1.5 | 1 |
| Order the materials and plan the deliveryguide rate | 2.9 | 2 |
| 3Mark the location and the height referenceguide rate | 1.5 | 1 |
| Dig the footprintweather | 1.6 | 1.2 |
| 4Spread and compact the MG-20weather | 2 | 1.4 |
| 5Build the risers, fill and glue the treadsweatherthen 8 h of waiting | 19.7 | 13.6 |
| Tie in to the paving and finishguide rate | 1.5 | 1 |
| Install the required handrail or guardguide rate | 2.9 | 2 |
| Learning the machines | 1.5 | 0.5 |
| Total (p-h) | 42.4 | 28.8 |
The rows add up to the total: 24.9 h of work calculated by the engine, plus 17.5 h of planning and checks at the guide's rate (beginner). 3 steps depend on the weather. Wait before the next step: 8 h. Read the full guide
Detail by calculation task(3)
| Task | Pro | Beginner | Intermediate |
|---|---|---|---|
| Machine excavation | 0.6 | 1.6 | 1.1 |
| Step base | 0.7 | 2 | 1.4 |
| Step construction | 6.8 | 19.7 | 13.6 |
| Learning the machines | - | 1.5 | 0.5 |
| Total | 8 | 42.3 | 28.7 |
Person-hours per task. Beginner and intermediate hours include rework.
What a contractor would charge
Before taxes
Where the money goes (typical price before taxes, $4,148)
| Materials | 18.3% | $759 |
|---|---|---|
| Labour | 8.5% | $351 |
| Equipment and rentals | 21.2% | $878 |
| Delivery and disposal | 15.1% | $625 |
| Overhead(estimate) | 27% | $1,120 |
| Margin(estimate) | 10% | $415 |
| Typical price before taxes | $4,148 | |
| GST (5%) | $207.42 | |
| QST (9.975%) | $413.81 | |
| Typical price with taxes | $4,770 |
Permits, licences and neighbours
- RBQ licence
Block or paver landings and steps set on gravel that serve an entrance without being attached to the building need no RBQ licence. Attached steps or steps on concrete footings belong to a licensed business (interpretation, to confirm with the RBQ for your case).
- Safety
For a stair serving a dwelling, the National Building Code 2020 values summarized by CCOHS are: rise 125 to 180 mm, run 255 to 355 mm, width at least 900 mm, handrail 865 to 1,070 mm high, uniform steps. The Quebec Construction Code edition in force remains to be confirmed.
- Safety
Handrail beyond three risers on a dwelling's exterior stair, and a guard where the walking surface is more than 600 mm above the ground beside it. Municipalities apply these rules their own way: check yours.
Source: CAA-Québec, Garde-corps et main courante pour votre sécurité · Municipalité de Roxton Pond, Présentation : garde-corps (2025)
- Permit · boucherville
Boucherville: the construction bylaw allows rises up to 216 mm for certain existing exterior stairs. An example of a local rule that changes the code.
Source: Ville de Boucherville, Règlement 2024-293-6 (construction)
Check with your municipality: rules differ from one city to the next.
- Utility locate
Before digging, even a small footprint, file a free Info-Excavation request at least 4 business days ahead.
Calculation parameters
See the assumptions(22)
Region: Quebec · prices as of October 13, 2026 · engine 1.2.0. These three values are enough to reproduce this calculation.
Where the numbers come from
- 1.paysagement (research), Costs: equipment rentals, labour, production rates and contractor sell prices (Quebec, 2025 to 2026)October 10, 2026 · Amérique du Nord · 10 values
- 2.paysagement (engine plan), Engine parameter registry seed list (estimates with no external source)October 10, 2026 · Québec · 3 values
- 3.Job Bank (Guichet-Emplois), wage report, EI survey data 2023-2024, updated 2025-11-19November 19, 2025 · Québec · 2 values
- 4.Patrick Morin, Gant de travail WATSON GLOVES STEALTH, grandOctober 10, 2026 · Québec · 2 values
- 5.paysagement (research), Quebec landscaping materials, delivery and disposal: sourced reference prices (2025 to 2026)October 10, 2026 · Québec · 2 values
- 6.Canadian Tire product page (price read from the search engine's copy of the page)October 10, 2026 · Québec · 1 value
- 7.Job Bank (Guichet-Emplois), wage report, EI survey data 2023-2024, updated 2025-11-19November 19, 2025 · Québec · 1 value
- 8.Job Bank (Guichet-Emplois), wage report, EI survey data 2023-2024, updated 2025-11-19November 19, 2025 · Québec · 1 value
- 9.Job Bank (Guichet-Emplois), wage report, EI survey data 2023-2024, updated 2025-11-19November 19, 2025 · Québec · 1 value
- 10.Lee Vrac Transport, Pierre concassee 0-3/4 DB en vracOctober 10, 2026 · Québec · 1 value
- 11.Lee Vrac Transport, Pierre concassee 3/4 net en vracOctober 10, 2026 · Québec · 1 value
- 12.Lou-Tec (web catalogue, CAD before tax)October 10, 2026 · Québec · 1 value
- 13.Lou-Tec (web catalogue, CAD before tax)October 10, 2026 · Québec · 1 value
- 14.Patrick Morin, Adhesif pour beton 300 ml (1252046)October 10, 2026 · Québec · 1 value
- 15.Patrick Morin, Coquilles anti-bruit (Workhorse)October 10, 2026 · Québec · 1 value
- 16.Patrick Morin, Lunette de securite legere (Workhorse)October 10, 2026 · Québec · 1 value
- 17.Patrick Morin, Masque de protection respiratoire anti-poussieres N95, 2/pqt (3M)October 10, 2026 · Québec · 1 value
- 18.Simplex (product page, CAD before tax)October 10, 2026 · Québec · 1 value
- 19.Soumission Renovation, driveway paver expansion guideSeptember 10, 2026 · Québec · 1 value