Municipality
Entrée charretière (fiche, juillet 2025)
- Consulted
- October 10, 2026
- Region
- monteregie
- Language
- fr
Cited by
What we take from it
- Certificate required; width equal to the driveway it serves, measured at the street line without the curb radii; at most two accesses per lot, at least 6 m between two, at least 7.5 m from the intersection; certificate of location required; cost paid by the applicant, work done by a City contractor in about 8 weeks, sometimes pushed to the next year.