Skip to content
paysagement
Supplier price

Conteneur Rose, 2026 price list (Laval, Montreal and surroundings)

Conteneur Rose

Open the source
Published
November 7, 2025
Consulted
October 10, 2026
Key
web.conteneurrose.com.be225963
Research
docs/research/costs-materials.md s.3 and costs-equipment-labour.md s.3.5

Prices observed in this source

18
DescriptionCategoryRegionDate
Dumpster 10 yd, mixed dry waste, 12 days and 1 t includeddisposal.dumpster.10yd.mixed.conteneur_rosedisposalQC-MZ-CMMOctober 10, 2026
Dumpster 15 yd, mixed dry waste, 12 days and 2 t includeddisposal.dumpster.15yd.mixed.conteneur_rosedisposalQC-MZ-CMMOctober 10, 2026
Dumpster 20 yd, mixed dry waste, 12 days and 2.5 t includeddisposal.dumpster.20yd.mixed.conteneur_rosedisposalQC-MZ-CMMOctober 10, 2026
Dumpster 30 yd, mixed dry waste, 12 days and 3.5 t includeddisposal.dumpster.30yd.mixed.conteneur_rosedisposalQC-MZ-CMMOctober 10, 2026
Dumpster 40 yd, mixed dry waste, 12 days and 4 t includeddisposal.dumpster.40yd.mixed.conteneur_rosedisposalQC-MZ-CMMOctober 10, 2026
Concrete or asphalt (unmixed) container, 12 days, 8 t includeddisposal.dumpster.concrete_asphalt_8t.conteneur_rosedisposalQC-MZ-CMMOctober 10, 2026
Clean soil container, 12 days, 8 t includeddisposal.dumpster.soil_8t.conteneur_rosedisposalQC-MZ-CMMOctober 10, 2026
Excess tonne of mixed waste over container allowancedisposal.extra_tonne.mixed_wastedisposalQC-MZ-CMMOctober 10, 2026
Excess tonne of soil over container allowancedisposal.extra_tonne.soildisposalQC-MZ-CMMOctober 10, 2026
Alley delivery feefee.conteneur_rose.alleysupplier_feeQC-MZ-CMMOctober 10, 2026
Excess tonne over the 8 t included in a concrete or asphalt containerfee.conteneur_rose.concrete_asphalt_extra_tsupplier_feeQC-MZ-CMMOctober 10, 2026
Distance fee, fromfee.conteneur_rose.distance_fromsupplier_feeQC-MZ-CMMOctober 10, 2026
Extra rental day after the 12 included daysfee.conteneur_rose.extra_daysupplier_feeQC-MZ-CMMOctober 10, 2026
Mixed soil, concrete, asphalt and brick container, 12 days and 8 t includedfee.conteneur_rose.mixed_soil_rubble_containersupplier_feeQC-MZ-CMMOctober 10, 2026
Excess tonne over the 8 t included in a mixed soil and rubble containerfee.conteneur_rose.mixed_soil_rubble_extra_tsupplier_feeQC-MZ-CMMOctober 10, 2026
Overload fee, fromfee.conteneur_rose.overload_fromsupplier_feeQC-MZ-CMMOctober 10, 2026
Waiting time after 15 minutes, per hourfee.conteneur_rose.waiting_per_hsupplier_feeQC-MZ-CMMOctober 10, 2026
Wasted trip fee, from (plus distance)fee.conteneur_rose.wasted_trip_fromsupplier_feeQC-MZ-CMMOctober 10, 2026

Engine parameters taken from this source

5
  • Container, concrete or asphalt, extra per tonnecontainer.concrete_asphalt.extra_per_t · QC-MZ-CMM
  • Container, mixed 10 yd, extra per tonnecontainer.mixed_10yd.extra_per_t · QC-MZ-CMM
  • Container, mixed soil and rubble, extra per tonnecontainer.mixed_soil_rubble.extra_per_t · QC-MZ-CMM
  • Container, overload feecontainer.overload_fee · QC-MZ-CMM
  • Container, soil, extra per tonnecontainer.soil.extra_per_t · QC-MZ-CMM