Skip to content
paysagement
Spoil disposal · Price in Quebec

Soil disposal, typical (unspecified soil class)

Code disposal.soil.guide.sq

Typical price in Quebec

$90.00per metric tonneestimate

Observed range $90.00

1 observation in $/t, Oct 2026 · before taxes

CEstimate

Industry estimate, low confidence, or an observation older than 12 months. Shown with the "estimate" label.

The observation

Only one comparable observation so far (Oct 2026). The time series will appear with the next collected prices.

Soumissions Quebec

Soil disposal, typical (unspecified soil class)

Observed price
$90.00/t
Region
All of Quebec
Date
2026-10-10
Channel
Contractors
Pickup or delivered
Delivered
Method
Industry estimate
Tax incl.
No

The same values are in the observations table.

Observations

Every observation used, newest first. Prices are the source's, before taxes unless stated.

  • Soumissions Quebec
    Soil disposal, typical (unspecified soil class)
    $90.00/t
    2026-10-10All of QuebecContractorsDeliveredTax incl. : No
    Industry estimateestimate

By region

Number of observations made in each administrative region. Other regions use the province-wide value.

  • 1 observation valid across Quebec

No local observation (province-wide value):

Bas-Saint-Laurent · Saguenay-Lac-Saint-Jean · Capitale-Nationale · Mauricie · Estrie · Montreal · Outaouais · Abitibi-Témiscamingue · Côte-Nord · Nord-du-Québec · Gaspésie-Îles-de-la-Madeleine · Chaudière-Appalaches · Laval · Lanaudière · Laurentides · Montérégie · Centre-du-Québec

Where this price is used

Engine reference rows built from these observations

  • 1 disposal rate

How we compute

  • The typical price is the median of the typical values of comparable observations, in the same unit. A 10 t load and a 5 t load are never mixed, unless the source lets us bring them back to a price per tonne.
  • Low and high are the lowest and highest observed prices: the range shows the real spread between suppliers. It is not a probability.
  • For a region, we keep observations made in the region, in the market zones that contain it, and prices valid across Quebec. With no local observation at all, the province-wide value is shown and the grade drops one step.
  • Observations older than 12 months stay visible, but they lower the confidence grade. No index adjustment is applied yet: the original price and its date are shown as they are.
  • Values are before taxes. Contractor prices are never published one by one.
Full methodology

Report a price

Report a price you paid or saw recently, with the date, region and supplier. It is checked before it enters the database.

Report a price