Hydraulic hammer in rocky ground, 500 ft2 area: machine hours
Code production.excavation.hydraulic_hammer_rock
Typical value in Quebec
Observed range 12 to 18
1 observation in h/500 sq ft, May 2026
Industry estimate, low confidence, or an observation older than 12 months. Shown with the "estimate" label.
The observation
Only one comparable observation so far (May 2026). The time series will appear with the next collected prices.
Hydraulic hammer in rocky ground, 500 ft2 area: machine hours
- Observed price
- 15 h/500 sq ft
- Region
- All of Quebec
- Date
- 2026-05-07
- Method
- Industry estimate
- Tax incl.
- Not stated
The same values are in the observations table.
Observations
Every observation used, newest first. Prices are the source's, before taxes unless stated.
- Soumission RenovationHydraulic hammer in rocky ground, 500 ft2 area: machine hours15 h/500 sq ft12 to 182026-05-07All of QuebecTax incl. : Not statedIndustry estimateestimate
| Date | Supplier or source | Region | Channel and fulfilment | Observed price | Comparable | Tax incl. | Method | Source |
|---|---|---|---|---|---|---|---|---|
| 2026-05-07 | Soumission Renovation Hydraulic hammer in rocky ground, 500 ft2 area: machine hours | All of Quebec | 15 h/500 sq ft 12 to 18 | Not stated | Industry estimate estimate |
By region
Number of observations made in each administrative region. Other regions use the province-wide value.
- 1 observation valid across Quebec
No local observation (province-wide value):
Bas-Saint-Laurent · Saguenay-Lac-Saint-Jean · Capitale-Nationale · Mauricie · Estrie · Montreal · Outaouais · Abitibi-Témiscamingue · Côte-Nord · Nord-du-Québec · Gaspésie-Îles-de-la-Madeleine · Chaudière-Appalaches · Laval · Lanaudière · Laurentides · Montérégie · Centre-du-Québec
Where this price is used
Engine reference rows built from these observations
- 1 production rate
How we compute
- The typical price is the median of the typical values of comparable observations, in the same unit. A 10 t load and a 5 t load are never mixed, unless the source lets us bring them back to a price per tonne.
- Low and high are the lowest and highest observed prices: the range shows the real spread between suppliers. It is not a probability.
- For a region, we keep observations made in the region, in the market zones that contain it, and prices valid across Quebec. With no local observation at all, the province-wide value is shown and the grade drops one step.
- Observations older than 12 months stay visible, but they lower the confidence grade. No index adjustment is applied yet: the original price and its date are shown as they are.
- Values are before taxes. Contractor prices are never published one by one.
Report a price
Report a price you paid or saw recently, with the date, region and supplier. It is checked before it enters the database.