Equipment rental · Price in Quebec

Mini excavator 1 t

Code mini_excavator.1t

Typical price in Quebec

$281.00per day

Observed range $281.00

1 observation in $/day, Oct 2026 · before taxes

BPublished

A published or listed price, or an official rate, under 12 months old.

The observation

Only one comparable observation so far (Oct 2026). The time series will appear with the next collected prices.

Simplex

Mini excavator 1 t diesel, rental per day

Observed price
$281.00/day
Region
All of Quebec
Date
2026-10-10
Channel
Rental
Method
Published price list
Tax incl.
No

The same values are in the observations table.

Observations

Every observation used, newest first. Prices are the source's, before taxes unless stated.

  • Simplex
    Mini excavator 1 t diesel, rental per day
    $281.00/day
    2026-10-10All of QuebecRentalTax incl. : No
    Published price list

By region

Number of observations made in each administrative region. Other regions use the province-wide value.

  • 1 observation valid across Quebec

No local observation (province-wide value):

Bas-Saint-Laurent · Saguenay-Lac-Saint-Jean · Capitale-Nationale · Mauricie · Estrie · Montreal · Outaouais · Abitibi-Témiscamingue · Côte-Nord · Nord-du-Québec · Gaspésie-Îles-de-la-Madeleine · Chaudière-Appalaches · Laval · Lanaudière · Laurentides · Montérégie · Centre-du-Québec

Where this price is used

Calculators that read this item

Engine reference rows built from these observations

  • 1 rental rate

How we compute

  • The typical price is the median of the typical values of comparable observations, in the same unit. A 10 t load and a 5 t load are never mixed, unless the source lets us bring them back to a price per tonne.
  • Low and high are the lowest and highest observed prices: the range shows the real spread between suppliers. It is not a probability.
  • For a region, we keep observations made in the region, in the market zones that contain it, and prices valid across Quebec. With no local observation at all, the province-wide value is shown and the grade drops one step.
  • Observations older than 12 months stay visible, but they lower the confidence grade. No index adjustment is applied yet: the original price and its date are shown as they are.
  • Values are before taxes. Contractor prices are never published one by one.
Full methodology

Report a price

Report a price you paid or saw recently, with the date, region and supplier. It is checked before it enters the database.

Report a price