Patio estimator
Amounts before taxes. GST (5%) and QST (9.975%) are added and shown separately. Source: paysagement cost databaseObserved October 13, 2026Region: QuebecPrices as of October 13, 2026 · Quebec · engine 1.2.0estimateReliability grade C
Good to know before you start
Before you digAny digging needs an Info-Excavation locate request at least 4 business days before starting, and hand digging within 1 m of the marks.
Source: Régie du bâtiment du Québec, Travaux d'excavation · APSAM (Association paritaire pour la santé et la sécurité du travail, secteur affaires municipales), Fiche technique 34, Protéger les services publics souterrains
Other notes from the calculation (2)
- No machine within 1 m of the locate marks: expose utilities by hand.
- Isolation joint of 21.34 m along the building or steps: paving must not butt against a fixed element (frost).
Where the money goes
Before taxes, one scale for both bars.
Do it yourself, money spent
$7,290- Materials$4,653
- Equipment rental$1,199
- Delivery$188
- Disposal$1,250
Contractor, typical price
$14,251- Materials$4,080
- Labour$1,907
- Equipment and rentals$1,554
- Delivery and disposal$1,438
- Overhead$3,848
- Margin$1,425
True cost: money and time
Before tax, one scale for every bar.
| Money, do it yourself | $7,290 |
|---|---|
| True cost, beginner | $12,616 |
| True cost, intermediate | $10,961 |
| Contractor | $11,000 to $18,000 ($14,000) |
Your time
| Measure | Beginner | Intermediate |
|---|---|---|
| Money spent | $7,290 | $7,290 |
| Person-hours | 152 h | 105 h |
| Days of 8 h, 2 people | 9.5 days | 7 days |
| Your time at $35/h | $5,326 | $3,671 |
| True cost | $12,616 | $10,961 |
Working days only: add rain days and waiting times (curing, deliveries).
Hiring costs less if your time is worth more than:
estimateAt $35/h: doing it yourself still costs less.
Break-even = (the contractor's typical price minus the money spent doing it yourself) divided by your person-hours. Before tax on both sides: GST and QST apply to both.
Actions
Estimates are computed in your browser: no account, and your projects stay on your device. The page link holds your choices: copy it to come back or to share it. "Save this project" keeps it in this browser only, nothing is sent. My projects
Step-by-step guide
Phases, "done when" checks, safety, common mistakes and sources, with your project's quantities.
What you buy, rent and pay for
Tools to buy (11)
Untick the ones you already own.- $34.91
- $16.99
- $8.99
- $129.99
- $16.99
- $13.99
- $39.98
- $5.09
- $9.99
- $14.99
- $12.99
- Total before taxes
- $7,289.76
- GST (5%)
- $364.49
- QST (9.975%)
- $727.15
- Total with taxes
- $8,381.40
GST and QST are computed on purchases and rentals; your own work is not taxed.
Notes on prices(5)
- Price for "MG-20 crushed stone (0-3/4 in)" out of date since 2025-04-01: confirm with the supplier.
- Price for "Concrete sand (bedding)" out of date since 2025-04-01: confirm with the supplier.
- Price for "delivery.boom_truck" is an estimate (no published price list).
- Price for "Isolation joint strip (foam)" is an estimate (no published price list).
- Price for "Proma slab 60 mm" is an estimate (no published price list).
How many hours, at what pace
- Work
- 131.8 h
- Rework
- 13.2 h
- Learning the machines
- 1.5 h
- Planning and checks
- 5.5 h
Beginner: has never compacted a base or cut pavers.
- Work
- 95.5 h
- Rework
- 4.8 h
- Learning the machines
- 0.5 h
- Planning and checks
- 4 h
Intermediate: has done at least one similar project.
For comparison, a professional: 49.7 h of work, about 2.5 crew days.
Step by step, from the guide
Each guide step, timed by the same calculation as the total: each task's hours at your level's pace, rework included. Hover a value to see the range.
| Step | Beginner | Intermediate |
|---|---|---|
| 1Measure, sketch and choose the productguide rate | 2 | 1 |
| Assess the soil and where water goesguide rate | 1 | 0.7 |
| 2Request a utility locate from Info-Excavationguide rate | 0.5 | 0.5 |
| Check your municipality's rulesguide rate | 1 | 1 |
| Plan deliveries, rentals and disposalguide rate | 1 | 0.7 |
| 3Lay out the area and set the grades | 6.2 | 4.3 |
| Dig to the right depthweather | 29.3 | 20.2 |
| 4Prepare the subgrade and lay the geotextileweather | 3.2 | 2.2 |
| Build the MG-20 base in compacted liftsweather | 30.8 | 21.3 |
| Install the edge restraint | 6.2 | 4.3 |
| 5Spread and screed the beddingweather | 12.3 | 8.5 |
| Lay the paversweather | 38.6 | 26.7 |
| Cut the edge pavers | 12.3 | 8.5 |
| Compact the pavers and fill the jointsweather | 3.1 | 2.2 |
| Finish the edges, clean up and inspectweather | 3 | 2.1 |
| Learning the machines | 1.5 | 0.5 |
| Total (p-h) | 152 | 104.7 |
The rows add up to the total: 146.5 h of work calculated by the engine, plus 5.5 h of planning and checks at the guide's rate (beginner). 7 steps depend on the weather. Read the full guide
Detail by calculation task(11)
| Task | Pro | Beginner | Intermediate |
|---|---|---|---|
| Machine excavation | 10 | 29.3 | 20.2 |
| Edge restraint installation | 2.1 | 6.2 | 4.3 |
| Isolation joint | 1.1 | 3.1 | 2.2 |
| Layout and grades | 2.1 | 6.2 | 4.3 |
| Subgrade preparation | 0.6 | 1.8 | 1.3 |
| Geotextile placement | 0.5 | 1.3 | 0.9 |
| MG-20 base compacted in lifts | 10.6 | 30.8 | 21.3 |
| Bedding screed | 4.2 | 12.3 | 8.5 |
| Paver laying | 12.2 | 35.5 | 24.5 |
| Cutting | 4.2 | 12.3 | 8.5 |
| Compaction and joints | 2.1 | 6.2 | 4.3 |
| Learning the machines | - | 1.5 | 0.5 |
| Total | 49.7 | 152 | 104.8 |
Person-hours per task. Beginner and intermediate hours include rework.
What a contractor would charge
Before taxes · $37 to $59 per ft²
Where the money goes (typical price before taxes, $14,251)
| Materials | 28.6% | $4,080 |
|---|---|---|
| Labour | 13.4% | $1,907 |
| Equipment and rentals | 10.9% | $1,554 |
| Delivery and disposal | 10.1% | $1,438 |
| Overhead(estimate) | 27% | $3,848 |
| Margin(estimate) | 10% | $1,425 |
| Typical price before taxes | $14,251 | |
| GST (5%) | $712.56 | |
| QST (9.975%) | $1,421.55 | |
| Typical price with taxes | $16,385 |
Permits, licences and neighbours
- Utility locate
Before digging, file a free request with Info-Excavation. The RBQ asks contractors to file it at least 4 business days before the work; it is valid until the stated end date, for at most 180 days. The construction safety code requires the employer to locate lines before digging. For an owner doing their own work, the request is strongly recommended even though that duty targets employers, and some municipalities, such as Magog, require it on their land.
Source: Régie du bâtiment du Québec, Travaux d'excavation · Gouvernement du Québec (LégisQuébec), Code de sécurité pour les travaux de construction, RLRQ c. S-2.1, r. 4 · Ville de Magog, Demande de localisation Info-Excavation
- RBQ licence
Per the RBQ licence guide, landscaping on private land, such as private driveways, low walls and paver landings resting on gravel that are not attached to the building, needs no licence. Owners may do this work at their own home, except electrical and gas work, which always goes to a qualified contractor. If you hire, check in the RBQ register that the contractor's subcategories cover the other parts of the contract, such as excavation or concrete.
Source: Régie du bâtiment du Québec, Guide pour déterminer le besoin d'une licence et la sous-catégorie pertinente : sous-catégorie 2.7, Entrepreneur en travaux d'emplacement · Régie du bâtiment du Québec, Travaux que vous pouvez faire vous-même · Régie du bâtiment du Québec, Vérifier la licence d'un entrepreneur
- Permit · Montréal
In Montreal, a permit is needed to build, modify or remove a parking space or access, and front-yard rules vary by borough: Saint-Laurent caps paving at 40% of the front yard with a 1 m green strip along the lot line, and several boroughs require materials with a solar reflectance index of at least 29. For a back-yard patio, check your borough's zoning bylaw.
Source: Ville de Montréal, Obtenir un permis pour aménager ou modifier un espace de stationnement
Check with your municipality: rules differ from one city to the next.
- Neighbours
The Civil Code (art. 979) requires lower land to receive the natural flow from higher land, but forbids the owner of the higher land from making the neighbour's situation worse. A new paved surface that concentrates water toward the lot line can therefore make you liable.
Source: Gouvernement du Québec, Écoulement des eaux (rapports de voisinage)
- Consumer protection
If you hire, ask for a written contract. The RBQ recommends that it show the licence number where applicable, the NEQ, the GST and QST numbers, the exact legal name and an itemized price (labour, materials, transport, equipment rental, subcontractors), with the smallest possible deposit. The Office de la protection du consommateur also lists what to ask for.
Source: Régie du bâtiment du Québec, Signer un contrat de rénovation · Office de la protection du consommateur, Request a contract (before hiring a renovation contractor)
Calculation parameters
See the assumptions(22)
Region: Quebec · prices as of October 13, 2026 · engine 1.2.0. These three values are enough to reproduce this calculation.
Where the numbers come from
- 1.paysagement (research), Costs: equipment rentals, labour, production rates and contractor sell prices (Quebec, 2025 to 2026)October 10, 2026 · Amérique du Nord · 10 values
- 2.paysagement (engine plan), Engine parameter registry seed list (estimates with no external source)October 10, 2026 · Québec · 3 values
- 3.paysagement (research), Quebec landscaping materials, delivery and disposal: sourced reference prices (2025 to 2026)October 10, 2026 · Québec · 3 values
- 4.Job Bank (Guichet-Emplois), wage report, EI survey data 2023-2024, updated 2025-11-19November 19, 2025 · Québec · 2 values
- 5.Patrick Morin, Gant de travail WATSON GLOVES STEALTH, grandOctober 10, 2026 · Québec · 2 values
- 6.Canac, Sable polymere pour paves RG+ granite 22,7 kg (code 8440001)October 10, 2026 · Québec · 1 value
- 7.Canadian Tire product page (price read from the search engine's copy of the page)October 10, 2026 · Québec · 1 value
- 8.Job Bank (Guichet-Emplois), wage report, EI survey data 2023-2024, updated 2025-11-19November 19, 2025 · Québec · 1 value
- 9.Job Bank (Guichet-Emplois), wage report, EI survey data 2023-2024, updated 2025-11-19November 19, 2025 · Québec · 1 value
- 10.Job Bank (Guichet-Emplois), wage report, EI survey data 2023-2024, updated 2025-11-19November 19, 2025 · Québec · 1 value
- 11.Lee Vrac Transport, Pierre concassee 0-3/4 DB en vracOctober 10, 2026 · Québec · 1 value
- 12.Lou-Tec (web catalogue, CAD before tax)October 10, 2026 · Québec · 1 value
- 13.Patrick Morin, Bois d'epinette sec no. 2 et meilleur, 2 po x 4 po x 10 piOctober 10, 2026 · Québec · 1 value
- 14.Patrick Morin, Bordure a pave-unis EMS Extrusion (0902367)October 10, 2026 · Québec · 1 value
- 15.Patrick Morin, Coquilles anti-bruit (Workhorse)October 10, 2026 · Québec · 1 value
- 16.Patrick Morin, Genouilleres de travailleur en mousse avec doublure TASKOctober 10, 2026 · Québec · 1 value
- 17.Patrick Morin, Geotextile gris 5 3/4 pi x 98 pi (1402824)October 10, 2026 · Québec · 1 value
- 18.Patrick Morin, Lunette de securite legere (Workhorse)October 10, 2026 · Québec · 1 value
- 19.Patrick Morin, Maillet en caoutchouc BEAUFORT, manche en bois, 32 ozOctober 10, 2026 · Québec · 1 value
- 20.Patrick Morin, Masque de protection respiratoire anti-poussieres N95, 2/pqt (3M)October 10, 2026 · Québec · 1 value
- 21.Paves Concept, CLOU VRILLEOctober 10, 2026 · Québec · 1 value
- 22.Paves Concept, Sable a betonOctober 10, 2026 · Québec · 1 value
- 23.Paysagement research estimate (Patrick Morin conduit price)October 10, 2026 · Québec · 1 value
- 24.Paysagement research estimate (Patrick Morin stake and chalk line prices)October 10, 2026 · Québec · 1 value
- 25.Simplex (product page, CAD before tax)October 10, 2026 · Québec · 1 value
- 26.Simplex (product page, CAD before tax)October 10, 2026 · Québec · 1 value
- 27.Soumission Renovation, driveway paver expansion guideSeptember 10, 2026 · Québec · 1 value