Skip to content
paysagement
Manufacturer

Proper embedment guidelines

Allan Block

Open the source
Consulted
October 10, 2026
Region
US
Language
en

Cited by

What we take from it

  • Allan Block calls for removing clay, wet or disturbed soil and replacing it with granular material in lifts of 200 mm or less.
  • Allan Block calls for at least two passes of a walk-behind plate on the pad.
  • Allan Block increases embedment when the ground slopes down in front of the toe.
  • Embedment and replacement of soft soils.