- The City lowers or rebuilds the sidewalk itself, May to October, and some boroughs bill the actual cost plus 15% administration. Access width 2.4 to 7.5 m, accesses totalling at most 50% of the lot width, at least 7.5 m between two accesses; cutting a tree to create the access is prohibited in some boroughs.
- In Montreal, the City lowers or rebuilds the sidewalk for a curb cut, May to October, after the permit.
- Montreal curb cut permit.